Project: Class III-B Combustible
Liquids Storage Warehouse, Braintree, MA
Client requested a review and analysis of the existing fire suppression and fire detection system in a storage warehouse in order to ensure compliance with current codes for this type of storage facility.
After performing the review and analysis of the existing fire protection systems, we concluded that the system was not capable of providing adequate protection for the intended use. Therefore, we designed a new fire suppression system with connection to the existing fire service that would provide our client with proper coverage as well as growth capacity. A new fire detection system was also designed in order to comply with current audio/visual device code requirements.
Client had systems installed and now has full use of their warehouse
building and room for potential business growth.
Click on links below to view plans. (Requires Adobe Acrobat Reader to view. Click here to download)
FA-1.pdf | FA-2.pdf |
FA-3.pdf | FP-2.pdf |
FP-1.pdf |